6 Useful Ways to Save Money on Shipping Construction Equipment

  • Editorial Team
  • Construction Safety
  • 5 December 2024

Shipping construction equipment can be pretty hard on the budget as it has the potential to consume significant amounts of profit. On one hand, reliable and quality shipping services must be hired to ensure the careful handling of heavy equipment and on the other, you need to ensure thorough attention to detail during the entire shipping process.

There are still ways to save on shipping while ensuring this process is carried out safely. Arranging for shipping in advance can help you save money. Experts can cite many ways in which money can be saved but it is essential that safe construction equipment shipping be prioritized so as to ensure the safety of the crew and equipment.

What are the costs associated with shipping construction equipment?

The cost of shipping construction equipment depends on numerous factors. Key among them are the size and weight. The shipping cost may increase if shipping involves larger and heavier equipment. Also, shipments that tend to be larger and heavier will require the allocation of more specialized resources. This includes load permits and escorts. All these factors may lead to an increase in shipping costs.

The shipping costs also depend on the mode of transport, such as air, rail, sea, and truck. The prices may vary across these different modes. For example, air shipping is more expensive than sea or land but still a speedier option. Hence, make your choice based on your preferences.

The travel distance is also another key element that decides the cost of shipment. Since during longer distances, more fuel and time will be required, the shipping costs will increase. Other possible factors that may influence shipping costs are storage, packaging, custom clearance fees, crating, and unloading requirements.

Keeping in mind all these factors will help you negotiate better rates and save on costs.

Tips on Reducing Cost

Proper planning of the route

Proper planning before dispatching the shipment can help save money, especially when it involves construction equipment. This will also ensure your shipping reaches its destination safely and on time, thereby saving money.

Take into account effective shipping methods

You need to keep in mind the weather factor while also being aware of possible delays. Along with these factors, also consider options related to effective shipping methods. This approach is critical in saving money and any possible financial repercussions due to rush fees or other expenses that may turn up at the last minute.

Try consolidating shipments into one

Consolidating shipments into one is a useful way of reducing the costs. Combined shipments are recommended because it is a low-cost method. It reduces the number of shipments required to transport heavy equipment and also saves time. You must also be aware that intermodal transportation turns out to be economical for shipping construction equipment.

Eliminate the redundant parts

Cutting the size and weight of the construction equipment being shipped is yet another useful way to reduce costs. This can be ensured by disassembling and eliminating any redundant parts that the equipment contains. This will help reduce the weight and hence the costs.

However, before adopting this method, it must be ascertained if the construction equipment can be effectively assembled again after dismantling. This will help avoid any damage.

Improve the packaging

Working on improving the package helps cut down costs if you are looking to ship construction equipment. While doing this, ensure that the packing design only serves to reduce the possibility of damage to the shipment.

Use technology

The use of technology serves many useful purposes in shipping construction equipment. It allows you to monitor progress and by doing so it helps optimize logistics while also allowing you to carefully plan routes. Utilizing technology will allow you to see the real-time progress of your shipment, especially its state and status while the shipment process is underway.

Red flags to avoid

To stay within your budget, you need accurate and competitive quotes from multiple resources. These are essential while you plan the shipment of construction equipment. When you compare the quotes, look out for the scope of service being offered and if it covers all your needs.

Doing the comparison will allow you to identify many red flags, such as unusually low quotes that may be a signal that the service is flawed. It will tell you about any possible hidden fees and any unclear insurance coverage. Other information that you obtain through the quotes will help you identify unrealistic delivery time periods. If you discover these red flags or if the service requests a high amount in advance payments, it is best to avoid such services.

To benefit from shipping services that are fast and reliable, contact the team at MY-Equipment. We specialize in international shipping and forwarding for construction machinery. Our services are highly cost-effective. For more information give us a call.

 

Don’t forget to subscribe to our YouTube channel for more equipment offers and insights into the industry.